AQW 39543/22-27 Written question to the Minister for Infrastructure
To ask the Minister for Infrastructure to detail any plans her Department has to address flooding from the Enler River, Comber.
Asked by Nick Mathison MLA on 2 February 2026
- Answered
- Written
- After due date
- Tabled
- 2 February 2026
- Answer due by
- 17 February 2026
- Answered
- 11 March 202637 days after tabling
- Department
- Department for Infrastructure
- Priority question
- No
Answer
My Department has no plans for upgrades to the river drainage infrastructure in Comber. Comber is not identified in either the current or previous Flood Risk Management Plan (FRMP) as an APSFR (Area of Potential Significant Flood Risk) nor has it been identified by our local teams as an area with a history of significant flooding therefore it is not on our current programme. However, during the summer months of 2025, significant maintenance was undertaken on the section of the Comber (Enler) River extending from Enler Gardens to the Killinchy Road Bridge. We will continue to inspect and maintain designated watercourses and their associated infrastructure within the Comber catchment, in line with our maintenance standards. If an inspection determines that there is a blockage significantly impeding the free flow of water within a watercourse or that drainage infrastructure is in an unsatisfactory condition, then works will be programmed.